01279757575 info@gibbsonn.com

Power and Data Coordination for Office Pods

Gibbsonn coordinates the power and data requirements needed to make your pod fully functional from installation.

Depending on the pod, this may include power for lighting, ventilation, sockets, USB charging, screens, video-conferencing equipment and other integrated technology. Data connections may also be required for reliable internet access, displays, booking systems or specialist equipment.

Planning these requirements early helps avoid exposed cables, unsuitable connection points and delays during installation.

Planned Around the Pod and Existing Space

Gibbsonn will review the pod specification, proposed position and equipment being installed. We can then identify the required connections and coordinate the work with the site team and appropriately qualified contractors where necessary.

Power supply, outlet positions, network requirements and cable routes can also be considered during the site survey and Space Planning and CAD stages.

For custom and bespoke pods, we can coordinate additional requirements such as multiple screens, podcasting equipment, access controls, specialist lighting and audiovisual systems.

Discuss your pod and technology requirements with our team so the necessary services can be planned before delivery and installation.

FREQUENTLY ASKED QUESTIONS

Power and Data FAQs

Do office pods need a power supply?

Most enclosed pods require power for lighting and ventilation. They may also include sockets, USB charging, screens and other electrical equipment.

Can you coordinate internet and data connections?

Yes. Gibbsonn can identify and coordinate suitable data connections for screens, video meetings, booking systems and other compatible technology.

When should power and data be planned?

Requirements should be reviewed before the pod is ordered and finalised before installation. This allows connection points and cable routes to be positioned correctly.